Modernization

Modernize without the big-bang rewrite.

We migrate the databases and applications everyone is afraid to touch — SQL Server and Oracle to PostgreSQL, monoliths to modern platforms — with compatibility analysis up front, rehearsed cutovers, and tested rollbacks. No surprise weekends.

3 wks Database Migration Assessment: inventory, compatibility, effort, cutover plan
2 paths flagship migration guides: SQL Server → PostgreSQL, Oracle → PostgreSQL
0 unrehearsed cutovers — every migration is dry-run before production
Migration factoryMigration factory: assess the estate, replicate with change data capture, validate row-for-row, cut over in a rehearsed window, then decommission the legacy system. AnovaCloud migration factory inventory sync rehearse retire ASSESS schema + code inventory compatibility scoring REPLICATE CDC keeps target in sync convert · rewrite · test VALIDATE row-for-row reconciliation perf baselines vs. target CUTOVER rehearsed window tested rollback plan FIG. 01 — THE MIGRATION FACTORY: NOTHING MOVES WITHOUT A REHEARSAL

Assessment first, always — the cutover plan is written before migration code.

What we do

Modernization offerings

01

SQL Server → PostgreSQL

Escape licensing gravity: a systematic migration of schemas, T-SQL, SSIS/SSRS estates, and application connections — with parity testing at every step.

  • Automated conversion plus manual rewrite where it matters (procedures, edge cases)
  • SSIS/SSRS rationalization: migrate, replace, or retire each workload deliberately
  • Application connection migration with feature-flagged cutover
Read the migration guide →
02

Oracle → PostgreSQL

Oracle estates carry the heaviest procedural logic — PL/SQL, packages, proprietary types. We inventory all of it and convert with discipline.

  • PL/SQL package-by-package conversion plan with complexity scoring
  • Proprietary feature mapping: sequences, partitioning, RAC behaviors
  • License-exit sequencing so savings fund the migration
Read the migration guide →
03

Application Modernization

Strangler-pattern renewal: carve the monolith at its seams, re-platform onto containers and managed services, retire the old code deliberately.

  • Domain-bounded carving — new services at natural seams, not random splits
  • Re-platforming onto containers, serverless, and managed data services
  • Dual-run periods with traffic shadowing before any retirement
Scope a modernization →
04

Database Migration Assessment — 3 weeks

Know the true cost before you commit: a fixed-scope assessment that turns "we should probably migrate" into a priced, sequenced plan.

  • Full schema, code, and job inventory with compatibility scoring
  • Effort model by workstream — convert, rewrite, redesign, retire
  • Cutover and rollback strategy matched to your downtime tolerance
Request the assessment →

Engagement models

How modernization engages

ModelFormatBest for
Migration assessment 3 weeks, fixed scope Pricing and de-risking the move before committing
Migration factory Phased, fixed-scope waves Executing the migration wave by wave with validation gates
Modernization program Quarterly roadmap Application + database renewal as a sustained program

FAQ

Modernization, answered

It depends on schema complexity, procedural code, and application coupling — which is exactly what our 3-week Database Migration Assessment quantifies. Simple estates move in weeks; complex ones are phased over quarters with zero-downtime cutover techniques.
That's where migrations die or succeed. We inventory every procedure, function, and proprietary construct, classify each as auto-convertible, rewritable, or redesign-required, and price the effort honestly before anyone commits.
For most OLTP workloads, yes: change-data-capture replication keeps source and target in sync, we validate row-for-row, then cut over with a short, planned window — rehearsed in advance, with a tested rollback.
No — application modernization too: strangler-pattern rewrites, monolith decomposition, and re-platforming onto containers and managed services. The database is usually the critical path, so we lead with it.
Three weeks: full schema and code inventory, compatibility analysis, effort model by workstream, risk register, and a cutover plan with rehearsal and rollback strategy. Request it here.

Start here

Know the true cost of your migration before you commit.

Three weeks, fixed scope: inventory, compatibility, effort model, cutover plan. Then decide with evidence.